Home News Manufacturers Systems Technical Quotes Contact

Ceilcote:
Choosing The Correct Lining

I. Chemical Solutions Present
A. List by chemical and percentage
B. PH as a last resort

II. Temperature
A. Normal Operating
B. Upset-
     1. Duration?
     2. How Often?

IV. Substrate

V. Finish Required On Surface Of Lining

VI. Jobsite Conditions
A. Indoors / Outdoors
B. Time of Year Installed

VII. If Old Tank, What Has It Been Used For In The Past?

VIII. Physical Abuse?

IX. Budget Constraints

X. Past History


                                                Previous

 
 

Pump and Corrosion Technologies
P.O. Box 9555 Wilmington, DE 19809

Tel: 302-655-3490
Fax: 302-655-2597

Email: Mail@PumpandCorrosion.com 


View My Stats